Pyongyang, January 22 (KCNA) — Workers of the Hamhung Railway Bureau in the DPRK are making innovations in transporting the freight needed for the grand construction sites.
Toksa and Hungnam railway stations have meticulously repaired and readjusted the loading and unloading equipment and applied efficient working methods to ensure the timely departure of loaded trains.
Wonsanhang, Sinsang and Inhung railway stations are taking measures to reduce the wagons’ stoppage time.
Engineers of Kowon and Hamhung engine service brigades are transporting a large amount of freight more than the planned through meticulous technical management of rolling stocks and application of appropriate operation methods.
Hamhung and Tanchon passenger and freight car corps are also enhancing the role of technicians and skilled workers and making effective use of the existing capabilities to repair and readjust wagons in a responsible manner, thus improving the safety of train operation.
Similar successes are being made among workers of Kowon and Hamhung trackmen’s teams and the Sinbukchong switching unit.